Bathroom remodel costs in the Upper Valley vary significantly depending on the size of the space, the scope of the work, and the materials you choose. A full bathroom refresh with new tile and fixtures is a very different project than a master bathroom overhaul with a custom shower and heated floors, and the price reflects that difference. This page breaks down what actually drives cost, what’s included in every Willow Brook Builders project, and what to watch for when comparing estimates. Whether you’re still in the planning stage or ready to talk specifics, reach out, and we’ll give you an accurate number for your home.
Bathroom remodels in the Upper Valley start at $45,000 for a Deluxe full bathroom project and reach $90,000 or more for a Luxury master bathroom remodel with a custom tile shower, freestanding tub, and heated floors. The range is wide because the projects differ significantly in scope, complexity, and material quality. Here’s what moves the number most.
Tile selection, coverage, and complexity
Tile is one of the most consequential decisions in a bathroom remodel, both for cost and for the final look. Material cost varies enormously: basic ceramic sits at one end of the spectrum, while large-format porcelain, natural stone, and handmade tile sit at the other. The total square footage of tile, the pattern (straight lay vs. herringbone vs. custom inlay), and the skill required to set it all affect the final number. A fully tiled shower with floor-to-ceiling walls and a niche requires far more labor than a simple tub surround.
Shower configuration and enclosure type
The shower is often the centerpiece of a bathroom remodel and one of its biggest cost variables. A tile tub surround is the most affordable starting point. A custom walk-in shower with a heavy frameless glass enclosure, built-in niches, and a bench is a substantially larger investment. Curbless shower entries, multiple showerheads, steam systems, and linear drains each add to the cost. The glass enclosure alone, particularly a thick, frameless unit with custom hardware, is a significant line item.
Tub decisions: keep, replace, or convert
What you do with the tub shapes both the scope and cost of the project. Keeping the existing tub and its tiling is the most budget-conscious option. Replacing it with a new soaking tub or freestanding model adds material and plumbing costs. Converting a tub-to-shower removes the tub entirely and opens up the footprint for a larger shower, which involves tile, glass, and plumbing work. A freestanding soaking tub, which is a hallmark of Luxury remodels, requires its own plumbing rough-in and is often paired with a floor-mount faucet.
Vanity type, size, and countertop
Vanity options range from semi-custom furniture-style pieces to fully custom millwork built for your specific space. A single vanity with a standard countertop is a very different cost than a double vanity with quartz or granite countertops, undermount sinks, and custom storage configuration. Floating vanities, which require blocking in the wall during rough-in, and vessel sinks, which have specific faucet requirements, add to the scope. Mirror selection and medicine cabinet installation are related costs that are easy to overlook.
Plumbing work and fixture relocation
Swapping fixtures in their existing locations is the most straightforward plumbing scenario. As soon as you start moving a sink, shower, or toilet to a new position in the room, you're opening walls and floors to re-route supply and drain lines. Relocating a toilet even a few feet can be a meaningful cost because it requires rerouting the drain line. Adding a water closet, installing a second sink for a double vanity, or adding a handheld showerhead to an existing shower are all plumbing additions that layer into the total.
Flooring material and heated floors
Bathroom flooring options include tile, luxury vinyl plank, and natural stone, each with different material and installation costs. Heated floors, which are popular in Upper Valley homes given the cold winters, require a radiant heat mat or cable system installed beneath the tile, a dedicated electrical circuit, and a thermostat. The installation adds both material and labor cost, but for many homeowners it becomes one of the most appreciated features of the finished bathroom. Larger bathrooms naturally cost more to floor and heat.
Countertop material and edge profiles
Quartz and granite are the standard choices for bathroom vanity countertops at this level, and they vary in cost based on the slab, thickness, and edge profile. An eased edge on a standard quartz slab is one cost; a mitered waterfall edge on a specialty stone is another. Integrated sinks, undermount sinks, and vessel sinks all interact with countertop selection in ways that affect fabrication and installation. The total square footage of a countertop is typically modest in a bathroom, so per-foot upgrades have a more limited impact here than in a kitchen.
Lighting design and electrical work
Bathroom lighting is more complex than it appears. Vanity lighting, recessed ceiling fixtures, decorative pendants, shower-rated recessed lights, and niche lighting all require dedicated circuits and placement decisions made during the design phase. GFCI outlets, exhaust fan upgrades, and heated towel rack circuits add to the electrical scope. If the existing panel needs to support new loads, that's an additional consideration. Lighting also has a significant impact on how the finished bathroom feels day to day, making it worth investing in properly.
Bathroom size and overall footprint
Square footage matters in a bathroom remodel because most of the major cost categories, including tile, flooring, labor, and heating, scale with the size of the space. A compact full bathroom and a large primary suite bathroom can have the same fixture count but very different total costs. The square footage of tile work, in particular, can double or triple between a smaller full bath and a master bath with a large walk-in shower and floor-to-ceiling tile walls.
Layout changes and structural work
Keeping the existing layout, with fixtures staying in their current locations, is one of the most effective ways to manage cost in a bathroom remodel. When a wall needs to move, the toilet needs to relocate to a new quadrant of the room, or the shower footprint needs to expand into adjacent space, structural and mechanical work increases meaningfully. Some Upper Valley homes also have older plumbing or electrical systems that need to be brought up to current code during a remodel, which adds scope that's hard to anticipate without an in-home visit.

Getting multiple quotes for a bathroom remodel and finding a wide spread between them is completely normal, and it rarely means one contractor is simply more expensive. Here’s what actually drives the difference:
In-house crew vs. subcontracted labor
Willow Brook Builders works with an in-house team of experienced carpenters, supported by a designer on staff, who carry a project from start to finish. Contractors who route tile, plumbing, and electrical work through different subs on a per-project basis often have less control over quality, scheduling, and communication. With an in-house crew, the people who showed up on day one are the people finishing the job.
Whether permits are pulled on every project
We handle all permits and inspections for every bathroom remodel we do. No exceptions. A bathroom remodel that involves plumbing, electrical, or structural changes requires a permit in Hanover, Norwich, and throughout the Upper Valley, and skipping that step exposes the homeowner to real risk: work that doesn't pass inspection, complications when selling the home, and no code-compliant record of what was done. If a bid looks significantly lower than others, ask directly whether permits are included.
Fixed-cost vs. open-ended pricing
We provide a detailed, fixed-cost proposal before any work begins. What's in the contract is what you pay, and any changes to scope are discussed and agreed on in writing before they happen. Open-ended pricing models shift the risk to the homeowner, and a bathroom remodel has enough variables, especially once walls are opened and older plumbing or subfloor conditions are revealed, that an open-ended contract can grow in ways that are hard to anticipate.
Whether design is included or separate
Our design process is part of every project. Before demolition starts, you'll work with our team through 3D renderings of your new bathroom, a digital scan of the existing space, and guided material selections for tile, fixtures, vanity, lighting, and flooring. Many contractors skip this step entirely, which means decisions get made in the field, under pressure, with no visual reference. The design phase is what ensures the finished bathroom actually matches what you had in mind.
The quality of materials specified
Two proposals can both reference "tile shower surround" or "frameless glass enclosure" and differ by thousands of dollars based on what's actually specified. Tile grade, glass thickness, hardware quality, vanity construction, and fixture brand all vary widely. A lower number often reflects lower-spec materials that are hard to identify without seeing the full specification. Before comparing quotes, ask each contractor to walk you through exactly what's included in each line item.
Project management and communication infrastructure
Every Willow Brook Builders project runs through JobTread, a construction management platform that keeps your project organized and keeps you informed with regular updates. Contractors who run projects informally, through text threads and phone calls, tend to have more scheduling gaps, more miscommunications, and more disputes over what was agreed to. Clear, documented project management isn't just a convenience. It's what keeps a bathroom remodel on schedule and on budget.
Every Willow Brook Builders bathroom remodel includes the following. There are no hidden line items and no surprises at contract signing.
Before a single tile is touched, you'll work through a complete design phase with our team: 3D renderings of your finished bathroom, a digital scan of the existing space, and guided selections for every material and fixture in the project. You'll see and approve the design before demolition begins.
We apply for and manage all required permits and coordinate every inspection. This is standard practice on every project we build, in Hanover, Plainfield, Norwich, Lyme, Etna, and throughout the Upper Valley.
Removing existing tile, vanities, flooring, and fixtures is included in the project scope. We protect adjacent areas of your home carefully during demo and handle responsible disposal of all materials.
Our own crew handles the core of your project. You're not getting a different sub for every trade. You're getting the same team, coordinated by our project manager, from the start of demo through the final walkthrough.
We contain the work area and clean up daily. Your home stays livable throughout the project, and we take care to protect flooring, walls, and belongings in adjacent spaces.
The number in your contract is the number you pay. We don't revise pricing mid-project based on how long something takes. If demo surfaces an unexpected condition, we discuss it with you and agree in writing before proceeding.
Every project runs through JobTread, and you'll receive regular progress updates. You'll never need to chase us down for a status check.
All labor and craftsmanship is covered by a two-year warranty, in addition to applicable product and manufacturer warranties on fixtures and materials.
Mirrors are not included in our Deluxe remodels unless specified. Freestanding accessories, towel bars, and toilet paper holders are typically owner-supplied and installed at the end of the project. If you have questions about what’s in or out of scope for your specific project, we’ll spell it out clearly in the proposal before you sign.
A lower bid from another contractor may not include design, permitting, a dedicated project manager, or a fixed-price contract. When you account for those differences, the gap between quotes often narrows considerably.

A figure like "$11,000" or "$25,000" for a bathroom remodel reflects a national average that includes everything from a basic builder-grade refresh in a small apartment bathroom to a high-end primary suite overhaul. These projects have almost nothing in common except that they both technically qualify as bathroom remodels. A full bathroom with new tile, a custom vanity, and a frameless glass shower in an Upper Valley home is a fundamentally different project than replacing a toilet and regrouting a tub. Using national average data to evaluate a local estimate is a reliable way to end up confused or disappointed.
Hanover, NH and Norwich, VT sit in a regional market with a limited pool of skilled tradespeople, higher material delivery costs than urban areas, and homeowners with above-average expectations for fit and finish. Tile setters, finish carpenters, and licensed plumbers are all in high demand across the Upper Valley, and that demand is reflected in pricing. What a bathroom remodel costs in a major metro area with abundant labor supply is not a useful reference point for what it costs here. If your benchmark is a national average, you're comparing apples to something entirely different.
A bid that looks significantly below the others is almost always missing something real. Common omissions include permit fees, a design phase, demo and disposal, subfloor repairs discovered during tile removal, and updates to older plumbing or electrical systems that are required by code once the walls are open. These costs don't go away just because they're absent from the estimate. They typically surface as change orders once work is underway, at a premium, and without the fixed-price protection of a well-structured contract. A detailed, complete proposal protects you from that experience.
In Charlotte, kitchen remodeling costs vary widely, from basic cosmetic updates to high-end transformations. 7 Day Kitchens falls slightly above the average price point for full-service kitchen remodels in the area.

Chris and Josh had lived in their house for years, but the dated finishes and functional issues kept it from ever truly feeling like “theirs.” They wanted a cohesive remodel to fix nagging problems and finally infuse their personal style into the kitchen.
Is a Bathroom Remodel Worth It?
A bathroom remodel is a real investment, and it’s not the right move for every homeowner at every moment. Here’s an honest look at when it makes sense, and when it doesn’t.
Your bathroom doesn't function well for your household
If you're sharing a single vanity, working around a shower that doesn't drain properly, or dealing with a tub you never use that takes up space you'd rather have as a walk-in shower, a remodel solves those problems for the long term. Functional frustrations compound over time, and a well-designed bathroom removes them entirely.
You plan to stay in your home for several years
A high-quality bathroom remodel pays dividends through daily use. Upper Valley homeowners who invest at this level and stay in their homes for five to ten years consistently say the project exceeded what they expected from a quality-of-life standpoint. The return isn't just financial. It's waking up to a bathroom that actually works for you.
Your primary bathroom is significantly outdated relative to the rest of the home
An outdated master bath can undercut the feel of an otherwise well-maintained home. Buyers notice, and so does anyone who lives there. When the bathroom finally matches the caliber of the rest of the house, the difference is immediate.
You're approaching a home sale and want to compete in the Upper Valley market
A renovated primary bathroom is consistently among the most influential factors for buyers in this area. It doesn't guarantee a specific return on investment, but a dated bathroom is often a negotiating point that works against sellers. A well-executed remodel removes that friction.
You want radiant heat or accessibility features built in while the walls are open
A bathroom remodel is the most cost-effective time to add heated floors, a curbless shower entry, or grab bar blocking. Adding these features after a project is finished requires reopening work that's already been completed, at significantly higher cost.
You want a design that was built around how your household actually uses the space
A custom bathroom reflects your daily routine, whether that means a double vanity, a dedicated soaking tub, a steam shower, or a smarter storage layout. That specificity is something you simply can't get from a builder-grade renovation.
You're planning to list the home within the next 12 months and primarily want ROI
A bathroom remodel at this investment level delivers real value, but it's not a transaction with a guaranteed dollar-for-dollar return. If your primary goal is maximizing sale price in the near term, talk to your real estate agent about what buyers in the Upper Valley specifically value before committing to a full remodel.
Your budget requires skipping the design phase or downgrading materials significantly
At this level, the value of the investment depends on doing it right. A bathroom remodel that cuts corners on tile quality, vanity construction, or glass thickness tends to show, and it limits how much you'll enjoy the space day to day. If the budget isn't there yet, it's worth waiting rather than compromising the outcome.
Your home has unresolved moisture or structural issues
Bathroom remodels frequently surface hidden water damage, deteriorated subfloors, or failed waterproofing behind existing tile. If your home has known moisture problems that haven't been addressed, those should be resolved before a full remodel begins. Otherwise, you're building on a compromised foundation.
You need the bathroom fully operational every day with no flexibility
Bathroom remodels take time, ranging from two to three weeks for a Deluxe project to six or more weeks for a Luxury primary suite. If the bathroom being remodeled is the only bathroom in the home, or your household has no tolerance for any disruption to that space, it's worth thinking carefully about timing before scheduling the project.
"Lorem ipsum lorem ipsum lorem ipsum lorem ipsum lorem ipsum lorem ipsum lorem ipsum lorem ipsum lorem ipsum lorem ipsum lorem ipsum lorem ipsum lorem ipsum lorem ipsum lorem ipsum lorem ipsum lorem ipsum lorem ipsum lorem ipsum lorem ipsum lorem ipsum lorem ipsum lorem ipsum lorem ipsum lorem ipsum."
Not every low estimate is a good deal. Here’s what to look for before you sign anything.
Bathroom remodels that include plumbing, electrical, or structural changes require permits in Hanover, Norwich, and throughout the Upper Valley. Skipping them is a common way to reduce cost and timeline, but it creates real liability for the homeowner. Work done without a permit isn't inspected, may not meet code, and can complicate a future sale or refinance. Some insurance policies also exclude coverage for unpermitted work. If a contractor doesn't automatically mention permits, ask directly whether they're included, and get the answer in writing.
A bathroom estimate produced without a contractor walking the actual space is a number without a foundation. The variables that drive bathroom remodel cost, including existing plumbing locations, subfloor condition, wall framing, ceiling height, and the presence of older materials like lead paint or asbestos backer board, can only be assessed in person. A quote given over the phone or from photos is either padded to cover unknowns or missing scope that will surface later as change orders. Either outcome is worse than waiting for an in-person estimate.
A proposal that lists "tile shower" or "new vanity" without specifying tile grade, square footage, vanity brand and dimensions, glass thickness, fixture model, and what's explicitly excluded is not a real proposal. It's an invitation to a dispute. Vague scopes of work are how change orders happen, and in bathroom remodeling, where material choices vary dramatically in cost, a vague spec sheet can turn a $65,000 project into an $85,000 project before the tile is finished. Insist on a full written specification before you sign.
A contractor who moves from site visit directly to construction without producing drawings, renderings, or a guided material selection process is skipping the step that determines whether your finished bathroom actually works. Tile patterns, fixture placement, shower dimensions, lighting layout, and vanity configuration are all decisions that compound on each other. Making them in the field, without a clear plan, leads to compromises that are expensive or impossible to correct after the fact. A proper design phase isn't overhead. It's what the finished product is built on.
Our bathroom remodels in the Hanover, NH and Norwich, VT area start at $45,000 for a Deluxe full bathroom project with new tile, vanity, fixtures, and flooring. A Premium remodel, which typically includes a new or converted shower, quartz countertops, upgraded toilet, and fresh paint, starts at $65,000. A Luxury primary bathroom remodel, which includes a custom tile shower with frameless glass, freestanding tub, heated floors, and premium finishes throughout, starts at $90,000. Your final number depends on the scope of work, the size of the space, and the materials you select.
Yes. We apply for and manage all required permits and coordinate every inspection on every project. Permits are not an optional line item. They’re a standard part of how we work throughout the Upper Valley.
A Deluxe bathroom remodel typically takes 2 to 3 weeks. A Premium remodel generally runs 4 to 6 weeks. A Luxury primary bath remodel takes 6 or more weeks depending on scope and custom elements. We establish a clear timeline before work begins and keep you updated throughout the project.
Before any demolition happens, you’ll work through a full design phase with our team. This includes 3D renderings of your new bathroom, a digital scan of the existing space, and guided selections for tile, vanity, fixtures, lighting, countertops, and flooring. You’ll see exactly what the finished bathroom will look like and approve every material choice before we break ground.
Yes, and it’s one of the most popular changes we make in bathroom remodels. Removing a tub that rarely gets used opens the footprint for a larger, more functional shower. We handle all of the plumbing reconfiguration, waterproofing, tile work, and glass installation involved. If you want to keep a soaking tub while also having a separate shower, that’s a conversation best had during the design phase, where we can show you how the layout works in your specific space.
Not the bathroom being remodeled. If this is your only bathroom, that’s an important factor to plan around before scheduling the project. If you have a second bathroom in the home, most households get through the project without significant disruption. We do everything we can to protect adjacent spaces and keep the rest of your home clean and functional while work is underway.